Coastal Fishing Forums: AllCoast banner

1 - 2 of 2 Posts

·
Registered
Joined
·
4,134 Posts
Discussion Starter · #1 ·
We took last weekend off to go fish with some fools and as usual we had an awesome time.....

Alex worked a couple of times at the shop during the week....

Now everything has to be thought out, measured, fabricated and then installed things are slowing down a little but that's to be expected.....

Alex shaving some 5/16th that's being welded in to support the deck..



I worked on the insulated fish hold doors...



Engine bays with some of the deck and the hinges installed...



The underside of the engine covers, these will be foamed to insulate the engine noise...



Inside look......

http://www.allcoastsportfishing.com/pho]

Fabricated the 3 new deck supports, you could stand an elephant on this deck now.....

[img]http://www.allcoastsportfishing.com/photos/data/500/100426DSC04519-med.JPG

You can see the C Channel water runoffs that Alex designed on both the engine covers and the fish holds...



Back for another day tomorrow....

Neill
 
1 - 2 of 2 Posts
Top